Project

SETTLEMENT OF CLIMATE CHANGE FACTORS - PHASE 1 CONSIDERED BY TIDES IN HCMC AREA.

Nhãn hiệu/ Chủng loạiProject location: Phu Xuan Hamlet, Long Thoi Commune, Nha Be District, Ho Chi Minh City.

SETTLEMENT OF CLIMATE CHANGE FACTORS - PHASE 1 CONSIDERED BY TIDES IN HCMC AREA.

Scale of project: The goal of the project is to control flooding caused by tides, proactively respond to climate change for an area of ​​750 km2 with about 6.5 million people on the right bank of the Saigon River and the city center. HCM in general, Nha Be district in particular.
The product has been granted: FIRE PREVENTION SYSTEM.

 

Number of Product's name Brand Amount
1 Electric motor water supply pump:
Pump head Ebara model:
100x80 FSJA
Electric motor model:
ESC 250M1-2
Ebara
Enertech
8
2 Diesel motor water supply pump::
Pump head Ebara model:
100x80 FSEbara model:
100x80 FSJA
Diesel  motor  model:
D4BB
Ebara
Hyundai
8
3 EVMSG5 15F5 Q1BEGE/3.0 Ebara 8

 

 

 

Other Posts

HI-TECH FACTORY

The product has been granted: Fire prevention system

WOLDON FACTORY

Project scale: 45 hectares The product has been granted: Fire prevention system

PROVINCIAL - LEVEL CUSTOMS DEPARTMENT BINH DUONG PROVINCE

Project scale: 5000 m2 The product has been granted: Fire prevention and supply purm

ILSHIN VIET NAM FACTORY

Project scale: 22 hectares The product has been granted: Fire prevention system, booster purm

RICCA DISTRICT 9

Project scale: 12.657m2 The product has been granted: Fire prevention system

EA NAM WIND FARM

Project scale: 600 hectares The product has been granted: Fire prevention system